
Bracelets
DS01
Screenless Bracelet · OEM / ODM available
Metal body with a silicone strap — a jewelry-first screenless bracelet. 20–30 days per charge, IP68+3ATM water resistance, 170+ sport modes and round-the-clock heart-rate tracking.
Specifications
| Display | Screenless |
| Battery Life | Typical use 20–30 days · standby ~45 days |
| Sensors | VC30F-S heart rate, STK8321-W G-sensor |
| Water Resistance | IP68+3ATM |
| Materials | Zinc alloy + plastic; metal / leather strap options, 10mm |
| Dimensions & Weight | 44 × 13 × 10 mm |
| Chipset | Realtek 8762ESF |
| App | QWatch Pro |
| Connectivity | Bluetooth 5.2 |
| Battery | 55mAh · magnetic charging, ~2 h |
| Sport Modes | 170+ |
OEM & customization
Logo printing / laser engraving from 500 units · startup logo & Bluetooth name from 1,000 units · additional language or custom color box from 3,000 units · custom nylon straps from 2,000 straps. Neutral orders of stock models from 50 units. Samples are charged at the 1–5 unit price tier and ship within a week; mass production follows sample approval.
New to sourcing wearables? Read our buyer guides on MOQs, lead times, materials and private label vs ODM.
Frequently asked questions
What is the minimum order for the DS01 with our logo?Logo silk-screen printing or laser engraving starts at 500 units. A custom startup logo and Bluetooth name start at 1,000 units; an additional UI language or a custom color retail box starts at 3,000 units; custom nylon straps start at 2,000 straps.
Can we get samples of the DS01 first?Yes — samples come first in our process. Contact Leo on WhatsApp or through the inquiry form and we will arrange sample units so you can validate the hardware, the app and the finish before any bulk order. Samples are charged at the 1–5 unit price tier and ship within a week.
What is the lead time for the DS01?Neutral orders of stock models start at 50 units, and up to 200 units ship within 1–3 days; other models generally ship within 30 days. Customized orders run about 30 days after sample approval, quoted as a delivery window with buffer built in.
What certifications do your products carry?Products are made under an ISO9001 quality system. Our existing products hold CE, FCC and RoHS certification, nickel-release testing, CE battery and IEC 62133 battery safety, UN38.3 battery transport reports and design patents; IP-rating test reports and the exact documents per model are available on request.
Do you take on ODM projects?Yes. We support product design, hardware development, structural development, manufacturing and test validation; the app and cloud platform are usually developed by the brand. A typical schedule: industrial design about 3 days, mechanical design 3–5 days, tooling about 30 days, T0 prototypes about 5 days, pilot production 7–10 days and mass production about 30 days after sample approval. MOQ and payment terms are confirmed per project.
Related models
Compare it with the rest of the lineup
Open the interactive catalog to compare up to three models side by side, or download the full PDF catalog.
DS02
DS03